Jason has been very busy over the past few weeks working on the our bedroom roof. 
First he needed to finish the porch to support the long overhang from the roof.  Once that was finished he began filling the roof cavity with insulation.

Here is a shot from the top of the roof looking down over the porch overhang and into the insulation cavity.  14 inches of cellulose should keep us warm, right? 


Finally, with porch and insulation finished, roofing could begin!